I started today with the realization that I forgot an entire chunk of the build (as I often tend to): the uploading and sinking wing, which I was planning to do as an extension onto the front. That’s gonna throw off the entire placement of the spiral staircase, so I simply tore it down entirely.
Before moving on with the staircase, I figured it’d be a good idea to finish out the triple-thick walls throughout the build, since they can be rather tricky to place, after I have stuff blocking the way. And since I was able to do it pretty darn quickly with a handful of repeatable blueprints.
Moving on to the new entrance wing, I was able to get it almost fully completed. Just need to add some lighting and the windows.
Tomorrow, I’ll get the staircase put back up.