Zagorath@aussie.zone to Aotearoa / New Zealand@lemmy.nzEnglish · 13 days ago‘Silly, stupid, short-sighted’: Cyclists unite over KiwiRail decisionwww.thepress.co.nzexternal-linkmessage-square4fedilinkarrow-up129arrow-down11
arrow-up128arrow-down1external-link‘Silly, stupid, short-sighted’: Cyclists unite over KiwiRail decisionwww.thepress.co.nzZagorath@aussie.zone to Aotearoa / New Zealand@lemmy.nzEnglish · 13 days agomessage-square4fedilink
minus-squareabsGeekNZ@lemmy.nzlinkfedilinkEnglisharrow-up6·13 days agoThe pictures don’t show any reason why this should be closed. It looks like a huge gap between the cycleway and the tracks. If the level crossing needs work, why close 1.5km of cycleway?
The pictures don’t show any reason why this should be closed.
It looks like a huge gap between the cycleway and the tracks. If the level crossing needs work, why close 1.5km of cycleway?