• mysticgreg@aussie.zone
    link
    fedilink
    arrow-up
    5
    ·
    edit-2
    11 months ago

    Ha this is me too. Just a few weeks ago finished a big four-zone system all done in about 120m of buried 19mm pipe.

    Thankfully it’s all phone-controllable, so we’ve just been able to hit ‘defer’ and not have it come on in the rain… but the defer button has been getting a workout :|