not unexpected, but a bummer

  • sorghum@sh.itjust.works
    link
    fedilink
    arrow-up
    7
    arrow-down
    2
    ·
    edit-2
    11 months ago

    That’s just a difference in testing methods. Testing to failure figuring out what went wrong and fixing it is a valid method. If you look at ULA’s timeline, their testing and design for Vulcan was done not during flights, but it cost them falling behind in launch orders.

    Besides, the lander wasn’t going to be used until Artemis III. Whatever delays II isn’t caused by SpaceX.

      • sorghum@sh.itjust.works
        link
        fedilink
        arrow-up
        2
        ·
        11 months ago

        Still doesn’t invalidate what I said. If their testing was done during flights it could have made it to space sooner.

        The BE-4 did look really good though.