• disguy_ovahea@lemmy.world
    link
    fedilink
    English
    arrow-up
    89
    arrow-down
    4
    ·
    13 days ago

    Three months of support is better than nothing, I guess. US global allied support really shouldn’t be determined by ignorant, racist, angry white men in low population areas.

    • naeap@sopuli.xyz
      link
      fedilink
      English
      arrow-up
      9
      ·
      13 days ago

      Will take some time until the contracts are signed/accepted (sorry, missing the right word here), and afterwards to actually fulfill those contracts. 3 months don’t even seem enough time for that, imho.
      But I don’t have much insight, how fast such things usually are processed

      • Benjaben@lemmy.world
        link
        fedilink
        English
        arrow-up
        5
        ·
        13 days ago

        You’re right, but I will say the federal govt has a sometimes magic way of greasing certain wheels and getting things done in a hurry, if the right person is pushing on it.

      • disguy_ovahea@lemmy.world
        link
        fedilink
        English
        arrow-up
        2
        ·
        13 days ago

        Fair point. I’m not sure myself, but it won’t be enough time if they’re anything like the general contractors I’ve used.

  • EmpireInDecay@lemmy.ml
    link
    fedilink
    English
    arrow-up
    8
    arrow-down
    110
    ·
    13 days ago

    They must be winding down the war, sending in contractors to pillage what’s left