• AutoTL;DR@lemmings.worldB
    link
    fedilink
    English
    arrow-up
    1
    ·
    4 个月前

    This is the best summary I could come up with:


    WASHINGTON (AP) — NASA said Wednesday it’s canceling its water-seeking moon rover, citing cost overruns and launch delays.

    The Viper rover was supposed to launch in late 2023 aboard a lander provided by Astrobotic Technology, but extra testing and increased costs kept delaying the mission, threatening other projects, the space agency said.

    The announcement comes days before the 55th anniversary of the Apollo 11 mission, which landed Neil Armstrong and Buzz Aldrin on the moon on July 20, 1969.

    NASA said it plans to study the presence of lunar ice through other projects.

    Astrobotic still plans to fly its Griffin moon lander — minus a rover — by the end of next year.

    The company’s first moonshot ended in failure in January with a fiery plunge over the South Pacific.


    The original article contains 181 words, the summary contains 130 words. Saved 28%. I’m a bot and I’m open source!